Multifamily electrical construction
Multifamily

Multifamily & Residential Tower Electrical

From foundation to final unit, we deliver the electrical scope that keeps residential developments on the GC's turnover schedule — and ready for the energy codes of the future.

Sector overview

Multifamily & Residential Tower Electrical

Multifamily is a logistics game: hundreds of identical units, central systems, amenity levels, and a relentless floor-by-floor turnover schedule. We staff and sequence the work to match the GC's pace, with BIM-coordinated rough-in that keeps trades moving.

We deliver house and unit power, central metering, riser distribution, amenity and site electrical, and the EV and electrification provisions New York's developments increasingly require for Local Law 97 compliance and long-term value.

Discuss a multifamily project

Tell us about your scope and schedule.

✅ Thank you — our pre-construction team will follow up shortly.
Multifamily electrical scope

Electrical systems we deliver

  • Service entrance, switchgear & risers
  • In-unit power, lighting & device fit-out
  • Central & sub-metering systems
  • Amenity, lobby & corridor lighting
  • EV-ready garage & site infrastructure
  • Fire alarm, intercom & low-voltage
Representative project

Proof in this sector

Waterfront Residences — 42-Story TowerMultifamily

Waterfront Residences — 42-Story Tower

Sample project — illustrative
480units
600ksq ft
LL97ready

Complete electrical for a ground-up residential high-rise: service and risers, unit fit-out, central metering, amenity levels, and an EV-ready garage — delivered ahead of the turnover schedule.

View the full portfolio
FAQ

Multifamily electrical questions

Can you keep pace with a floor-by-floor turnover schedule?

Yes — we staff multifamily projects to match the GC's cycle and use BIM-coordinated rough-in to keep the trade stack moving without rework.

Do you provide EV-ready and LL97-compliant infrastructure?

We design and install EV-ready garage infrastructure and plan electrical capacity for building electrification so developments meet Local Law 97 carbon requirements over time.

Do you handle both house and unit electrical?

Yes — from the service entrance and risers through central systems, amenities, and individual unit fit-out and metering.

Building in multifamily? Let's talk.

Bring Maximus in during pre-construction for the best schedule and cost outcome.